Facebook Instagram Twitter Youtube
  • Home
  • Latest
  • Punjab
  • Himachal Pradesh
  • Haryana
  • Education
  • Health
  • Transfer
  • Punjabi News
  • India
  • Others
  • Elections
  • Contact Us
Search
Sign in
Welcome! Log into your account
Forgot your password? Get help
Password recovery
Recover your password
A password will be e-mailed to you.
Royal Patiala Royal Patiala
Royal Patiala Royal Patiala
  • Home
  • Latest
  • Punjab
  • Himachal Pradesh
  • Haryana
  • Education
  • Health
  • Transfer
  • Punjabi News
  • India
  • Others
  • Elections
  • Contact Us
Home Punjab TSPL penalized on account of hardship faced by the people of Punjab:...

TSPL penalized on account of hardship faced by the people of Punjab: A.Venu Prasad

325
Share
Facebook
Twitter
Pinterest
WhatsApp
Linkedin
Email
Print
Telegram
    Race on for Special Chief Secretary to Chief Minister Punjab and president IAS officers Association
    PSPCL CMD A Venu Prasad IAS

    TSPL penalized on account of hardship faced by the people of Punjab: A.Venu Prasad

    Kanwar Inder Singh/ royalpatiala.in

    There was a sudden disruption in power supply on 30th June and 1st July in the state due to sudden failure of second unit of Talwandi Sabo Power plant, Ropar thermal plant and low level of power generation from Bhakra Hydro project.

    PSPCL CMD A.Venu Prasad disclosed that PSPCL has now issued a penalty notice to Talwandi Sabo Thermal Power Plant for not ensuring timely availability of its unit no 3. He said that PSPCL has been repeatedly directing TSPL to ensure full availability of its 3 units in the paddy season including unit no. 3 under forced outage which the TSPL has failed to do so till date whereas paddy season is in full swing.

    TSPL penalized on account of hardship faced by the people of Punjab: A.Venu Prasad
    TSPL

    He also said that due to failure of unit no. 3, PSPCL faced tremendous difficulty in providing 8 hours of uninterrupted power supply to its agriculture and domestic consumers of the state. He said that PSPCL has directed TSPL to make all out efforts to make unit no. 3 available at the earliest, PSPCL has issued the notice to TSPL asking them to explain as to why the capacity charges should not be deducted for the entire contract year 2021-22 considering non-availability of its unit under breakdown and be penalized on account of hardship faced by the people of Punjab.

    He further added that PSPCL in spite of this mechanical fault has managed to supply full 8 hours of power to agriculture sector for the last 3 days. No power cut has been imposed on domestic sector. This was made possible by  getting the limit of transmission corridor increased from Northern Regional Load Despatch Centre (NRLDC) due to failure of one unit of TSPL and getting increased power purchase ( to the extent allowed-7400MW) from power exchange to the maximum limit and several administrative measures.

    July 4,2021

    Share
    Facebook
    Twitter
    Pinterest
    WhatsApp
    Linkedin
    Email
    Print
    Telegram
      Previous articlePower pang-PSPCL issue notice to TSPL for power crises; penalized earlier also for mis-declaration
      Next articleਅੱਜ ਪਟਿਆਲਾ ਜ਼ਿਲ੍ਹੇ ਦਾ ਕੋਵਿਡ ਅਪਡੇਟ: ਸਿਵਲ ਸਰਜਨ
      Kanwar Inder Singh

      RELATED ARTICLESMORE FROM AUTHOR

      Rupnagar Cong MC president faces no confidence motion-Photo courtesy-The Global kashmir

      Rupnagar Cong MC president faces no confidence motion

      Commission summons Patiala’s Deputy Commissioner in two cases

      Commission summons Patiala’s Deputy Commissioner in two cases

      15 August celebrations schedule released; CM, Speaker, Ministers allotted districts to hoist National Flag

      15 August celebrations schedule released; CM, Speaker, Ministers allotted districts to hoist National Flag

      - Advertisement -

      MOST POPULAR

      Three member committee formed to identify new voters-CEO Dr Raju

      Three member committee formed to identify new voters-CEO Dr Raju

      IIT Ropar’s AWaDH and Khalsa College of Engineering & Technology, Amritsar to launch Cyber-Physical Systems in Punjab

      IIT Ropar’s AWaDH and Khalsa College of Engineering & Technology, Amritsar...

      YPS organizing first ever Grand Marathon; registration open

      YPS organizing first ever Grand Marathon; registration open

      Vigilance Bureau arrests trader who was avoiding his arrest

      Vigilance Bureau arrests trader who was avoiding his arrest

      Load more

      HOT NEWS

      Vacant pvt medical seats filled as per NEET merit list:SC

      ਪਟਿਆਲਾ ‘ਚ ਸੂਦ ਭਵਨ ਬਨਾਉਂਣ ਲਈ ਸੂਦ ਭਾਈਚਾਰੇ ਦੀ ਹੋਈ ਅਹਿਮ ਮੀਟਿੰਗ

      ਪਟਿਆਲਾ ‘ਚ ਸੂਦ ਭਵਨ ਬਨਾਉਂਣ ਲਈ ਸੂਦ ਭਾਈਚਾਰੇ ਦੀ ਹੋਈ ਅਹਿਮ...

      PM bows to Bhai Taru Singh Ji, on his 300th birth anniversary

      PM bows to Bhai Taru Singh Ji, on his 300th birth...

      Dr. Ambedkar Centre of Excellence (DACE), Dr. Ambedkar Chair to be established at CUP Bathinda

      Dr. Ambedkar Centre of Excellence (DACE), Dr. Ambedkar Chair to be...

      EDITOR PICKS

      The City Beautiful turns 71

      Patiala’s foundation day goes unnoticed

      Srinagar’s ‘PariMahal’ –Abode of Fairies: Mohammad Hanief

      POPULAR POSTS

      GNDU Vice-Chancellor in trouble after sharing educational session with RSS chief Mohan Bhagwat

      Water level in Bhakra, Pong, Ranjit Sagar dam reservoirs increasing rapidly , margin is decreasing

      Grand event to be held in Kurukshetra on November 25 to mark 350th Martyrdom Day of Shri Guru Tegh Bahadur Ji

      POPULAR CATEGORY

      • Punjab12293
      • Education2215
      • Covid-19-Update2085
      • Others1791
      • ਪੰਜਾਬੀ ਖਬਰਾਂ1433
      • India1405
      • Health1300

      ABOUT US

      The RoyalPatiala Sites may contain links to or advertisements concerning other Web sites. Other sites may also reference, advertise, or link to RoyalPatiala Site.

      Contact us: [email protected]

      FOLLOW US

      Facebook
      Instagram
      Twitter
      Youtube

      © All Rights Reserved

      • Home
      • Privacy Policy